1. Progress status

The URD has been updated to cope with comments received from ESTEC. It now shows that we are only working with the 400 kV power system and a subset of transformers. Version 1.5 (2003-12-18) can be found at http://www.lund.irf.se/gicpilot/gicpilotinternal/wp/100/

Risto Pirjola acted as an examiner of a PhD thesis on GIC research at the University of Edinburgh, UK, on December 16. Calculated results of GIC in the Scottish Power System presented in the thesis had been obtained by applying the same computation algorithm as that used in the present project.

Discussions were carried out how to use the same technique for determining GIC in the German power network.

Risto Pirjola has been invited to organise a GIC-related session at the "EUROEM'2004 Conference" to be held in Magdeburg, Germany, in July 2004. Henrik Lundstedt might be a co-convener of the session.

Work has been done at FMI to introduce GIC for PR purposes during a "Space Weather Week" at the "Heureka Science Centre" in Finland in February 2004.

Work with implementing services (WP500) is in progress and no delay is foreseen.

WP 100 User requirements

The URD has been updated to cope with the comments from ESTEC.

 

URD version 1.5 in pdf-format (2003-12-18).

 

Older versions of the URD can be found at http://www.lund.irf.se/gicpilot/gicpilotinternal/wp/100/

 

WP200 Database

Information about GIC-data shall be included in the database.

Draft Technical Note is ready. It contains four parts: the solar wind, the magnetic field, GIC-data, and data about the power grid.

Technical note at T0 + 6 according to the schedule

 

WP201 Solar wind and GIC datasets

We shall only take the 400 kV power net into account. The 220 kV power net is not connected to OKG.

Data set with GIC data ready at T0 + 4.5 according to the schedule

 

WP202 Dataset with computed geomagnetic data in a dense grid

Work has started.

Data set with geomagnetic data grid ready at T0 + 4.5 according to the schedule

 

WP300 Model for computation of GIC from geomagnetic field

Different methods to estimate GIC shall be compared.

Program code exists.

Software package ready at T0 + 6 according to the schedule

Technical note ready at T0 + 6 according to the schedule

 

WP301 Model for computation of geoelectric field from geomagnetic field

FMI has prepared software applicable to the computation of geoelectric field from geomagnetic field

Software package ready at T0 + 5.5 according to the schedule

 

WP302 Model for computation of GIC from geoelectric field

FMI has prepared software applicable to the computation of GIC from geoelectric field.

Software package ready at T0 + 5.5 according to the schedule

 

WP400 Forecasting model of GIC from solar wind data

Will start by comparing the forecast of B-field from Uppsala with measured values. It is important to cover the high values of dB/dt. A list of interesting events (WP400) to be used for analysis and testing has been identified. It will be available at http://www.lund.irf.se/gicpilot/gicpilotinternal/eventList.html

Software package ready at T0 + 9 according to the schedule

Technical note ready at T0 + 9 according to the schedule

 

WP401 Forecasting model of geomagnetical grid from solar wind data

Work has started.

Software package ready at T0 + 8.5 according to the schedule

 

WP402 Forecasting model of observed GIC from solar wind

Work has started.

Software package ready at T0 + 8.5 according to the schedule

 

WP500 Service implemention

Work with implementing services is in progress and no delay is foreseen. One part of this is the decision that a fluxgate magnetometer shall be installed close to the town of V”xj–.

Software requirements document ready at T0 + 12 according to the schedule

Prototype software system ready at T0 + 12 according to the schedule

System manual ready at T0 + 12 according to the schedule

User manual ready at T0 + 12 according to the schedule

Test report ready at T0 + 12 according to the schedule

 

WP600 Cost-benefit analysis

Start T0+12 according to the schedule

Cost benefit report ready at T0 + 24

 

WP700 Management

Business plan ready at T0 + 24

 

2. Problem areas/reasons for slippages

None

 

3. Events anticipated to be accomplished during next reporting period

No major event during January.

 

4. Status report on all long lead or critical delivery items

None

 

5. Action items

No Open

 

6. Milestone payment status

Advance payment has been received.

 

7. Expected dates for major schedule items

Date for the next Progress Meeting is Spring 2004.

 


internal page

GIC home page

Swedish Institute of Space Physics
PO Box 812
SE-981 28 Kiruna, Sweden

Phone

+46 980 790 00

Fax

+ 46 980 790 91

internet

www.irf.se